Mountain.RU

newsclimbski & snowboardadventurephotossearch

russian

Mountain photos - amateur and professional photos of mountains.


Shisha Pangma, 8027

The team:
Simone Moro ITA
Piotr Morawski POL
Jacek Jawien POL
Darek Zaluski POL
Jan Szulc
POL

The map:

Shisha Pangma Winter. First attempt. 2003-2004ã.

 

Check out the previous story on the Mountain.RU:
Simone Moro. CV
Simone Moro. Interview for Mountain.RU

 

First Shisha Pangma Winter Ascent

Russian

News:

(24.01.2005) new!
20.01

Till the end this expedition was very hard…
After the summit and the attempt form Jacek and Darek, they braked for the horrible wind and temperature (more than - 40 degree) it begins to snow and it bad weather continue. We decided to try to go to Nyalam, the first village, where we did start our trek one month ago. There we will take the jeeps to Kathmandu.

The day before we start our descent adventure we lost our Kitchenboy Chiring, who went to ABC to take down the last things….. In the evening he didn’t come back to BC and we was very worry…. All together we went out in the darkness and the storm, looking for him. We thought about the worst, because the temperature was very low and it had snow a lot. Luckily Chiring organised by himself one bivac 2 ours far from BC, when he understood the difficulty of the situation. But we pasted a very bad night….

The they after we Chiring arrived in BC and we all were very happy to see him. But one other dramatic adventure was starting. At 12:30 we started from BC at 5200 meters to Nyalam at 3750 and 25 km far. Nobody from us thought, that only after some ours we would find storm, - 30 degree, fog and snow sometimes till our waist!!! We needed 14 ours without stop, fighting with the elements and in the darkness, before we arrived with totally cold in Nyalam. My small finger is black and all the other fingers I have only partially sensibility. The others are only tired from the exhausting work and some small frostbite in the face (also I have….). More than one time we finished in the icy water from the river, because he was covert by thin ice and snow, that broken when we passed over. Other times the snow was so deep and powdery near to impossible to go on. At 3:30 Peking time Piotr and I reached the place where we slept when we did go up. The others came a little later and at last Jan after some ours. I think our looks were not so nice, because the people observed us long…..

The day after we droved by the jeep to Zangmu, the boarder to Nepal. There we take showers and sauna for 3 ours non-stop!!!

Today we arrived at Kathmandu. On more shower and now we are preparing to go out from our Hotel and I want to eat a big beef and make party for be back to the normality.  

P.S. Today, the 20th of January the CTMA certificated our summit with the sentence “first winter Summit” as the first winter summit from Shisha Pangma, maked by Simone Moro ITA and Piotr Morawski POL at the 14th of Januray    

 

(18.01.2005)
18.01

Bad weather. Since 3 days is snowing and obviously the yak can not start from Nyalam and come to base camp to take all our equipment and transport to the village that is 25 km from here. In the meantime we celebrate the success play cart, or chess, reading books and also waiting boring for the sun....

Portfolio

 

Simone on The summit
Piotr on the  Summit

(14.01.2005)
14.01

Summit!
Simone Moro and Piotr Morawski summited today at 13.15. We followed the Yugoslavian route on the south face of Shisha Pangma.

Yesterday we fixed ropes to the col, set up the Camp II, and today we decided for a summit push. The wind was strong, reaching 30-35 m/s. After 5 hours of fast climbing we summited.

This is first winter ascent on Shisha Pangma in history (callendar winter started 21st December) and we can truly say that in typical winter conditions (strong wind, no snow, a lot of ice). Now only six 8000 meters peaks are waiting for its first winter ascents...

 

(14.01.2005)
13.01

Simone and Piotr reached the col and put up Camp 2 on 7400!
Today morning we took the tent (heavy but we wanted C2 to be comfortable), sleeping bags and food. We climbed very fast because we wanted to reach the col. On 7300 we started also to fix. Most of today climbing was on the rocky part, not difficult, but dangerous (moving stones and not solid rock). When we reached the col it was already in shadow, and it was extremely cold. During setting up the tent we observed that a part of the ridge is little protected from this terrible, strong and freezing wind. A big part of the ridge is of course not protected, but... So we decided to try summit tomorrow! Cross fingers!...

Simone and Piotr

(13.01.2005)
12.01

All the night the wind shook the tents and it was difficult to sleep. Also the mountain was very loud, showing what the hell is going up. In the morning we wait for the sun and then we crowed from our sleepingbags.

Today the sky was with no clouds, but cold wind was stopping us, especially on plateau. Now we are sitting in the tent of Camp 1 and prepare for tomorrow: very important and also exhausting day. We wish the wind let us through the col...
Simone and Piotr

(12.01.2005)
11.01

Going up! The next attack to the mountain has just begun. We're sitting (Simone and Piotr) already in ABC (5600). After a few days rest Darek and Jacek are also going up.

The wind is still blowing with terrible force. But we'd like to reach the col (about 7300) and hope to set up Camp 2 behind the col. Today, during the way to the ABC we were watching a wind smoke on the summit ridge, and we didn't want even to think what was up there...

Also the south wall of Shisha has totally changed character comparing to that 2 weeks ago: instead of snow we could see big fields of pure ice!

(11.01.2005)
10.01

First day of the week and, as the weather forecast said, will be the same all the rest of the week: windy!!. The wind continue to be strong and for the next weekend Karl Gabl from Innsbruck said that the speed could arrive also to 180 km/h!!!! "be patient" said Karl, but for us is difficult to be... We are in a good physical condition and motivation is high... In any case we will follow his advise and Piotr and I will go tomorrow "only" to try to finish to fix all the route till the ridge at 7300 and fix C2. Than we will be back in base camp waiting for good news from Karl and his perfect forecast.

09.01
Wind, wind, strong wind. Today the force of the wind is extremely high. We decided to reinforce with ropes and big stones the kitchen tend and dining tend. The store tend brake this morning for the strong wind. The birds already brake many tends (also in C1) looking for food so we don't want to have other damages to our equipment. At 10 am we get contact with Darek and Jacek that still were in C1. Yesterday they get a really hard job and difficult conditions and this morning was difficult to take decision to left the sleeping bags and start for the descent to ABC and BC. Jan also started to come down from ABC to BC and this evening we will be all together here at 5200 meter of Base Camp. Tomorrow we will take decision and strategies for the next important week....

08.01
Another day of extreme cold and strong wind, but Darek and Jacek did a great job. They carried 400 meters of rope till 7200 and fix 100 of those. It had been not enough to reach the ridge but it is closer and closer.... Now Darek and Jacek "sleep" in C1 and tomorrow they probably came down to ABC or BC to take a good rest. I and Piotr continue to eat and get rest to be ready after a few days to set C2 and maybe make already a first summit attempt.... Yesterday we finished to repair one of the 3 tends we get in ABC that had been seriously broken from the big hungry birds. The birds were looking for food and brake all the tends, without find any food (we left especially in a plastic drum). Maybe the damage is a revenge....?

07.01
Yesterday we get a terrible cold and difficult day but at the end we reached 7200 m. Piotr and I dreamed to stand up of the ridge but we finished the fix rope at 50/100 m of altitude to the ridge. We have to set 200/300 m rope still. We would like to observe the last 700 meters of difference between the col and the summit. In our plan after rest, we want to fix a tend on the col at 7350 meter and spend night to acclimatise well and also using that point as the starting point for the summit. Today Piotr and I came back to Base camp and we will remain 3 days to get a full rest. Yesterday we get -40° degree and strong wind and we need time to find again the energies to work. Darek and Jacek today carried up 400 meters rope till C1. Tomorrow they will try to carry higher.... Cross the finger for us.... The next 1/2 weeks will be extremely important for the climb.
FOTO: Cold in the tend

05.01
The winter now is here completely...
Wind was attacking us all the day. On the morning temperature was about -30 degree Celsius in the ABC at 5600 m.
Darek and Jacek were working all the day above the C1 (6550 m). They probably reached 6800 m, foot of the last few hundreds meters of couloir.
Today Simone and Piotr carried equipment to C1, also the tent for Camp 2, which should stand on the col.
Our route occured longer than we expected and with ropes we already have up, it will be difficult to reach the col. But we will do our best.

04.01
The good weather returned. After 4 days of storm and cold, today we saw again the sun. It had been a cold night but the morning sun get us the possibility to continue to work on the mountain. Unfortunately with the sun is arrived also the strong wind in high altitude and in the next weekend the speed will be over 40 m/sec (160 km/h). Today Darek and Jacek went to ABC and tomorrow they will reach the tend we set at 6600 m. They will spend night and the day after will try to climb higher. Piotr and I will follow them tomorrow and for the week end we dream to reach the end of the face ad set the tend on the ridge at 7200 m. The problem will be the wind... but we will try to do our best to resist. Yesterday we get the first technical problem. Our generator stopped to work and "get frostbite". Piotr and Jan today made a surgery operation and they obtain to get 12 volt power from it. Together my solar pannel we should continue to give enough energy to our camp...

01.01.2005
Is arrived also here at base camp the midnight but nobody was in the dining tend waiting for it. We was too tired and was to cold and we decided to go in our warm sleeping bags and sleep deeply. Also today the weather is bad with wind and snow and it should be the same also for the next 2 days. Karl Gabl (our Austrian Guru for the weahter forecast) said to be patient and to call him Monday in Innsbruck. We will have our next weather forecast and we hope to have good news...

We wish again a nice 2005 full of smiling moments...

31.12
After 4 days climbing along the Jugoslavian route on Shisha Pangma, we came back to Base Camp. Storm and bad weather obliged us to turn back. I and Piotr spent nigh at 6550 and today we planned to go near 7000 meters but this was impossible. So from 6550 we came directly back to 5200 meters of base camp (log way....) Last night the wind and the cold had been a good test for our capacities. The bad weather should persist for the next 3/4 days and we will take a good rest and "charge our motivations and determination". Tonight we will celebrate the new year and we wish to all of you a 2005 in health and without any polemic... Have a nice 2005!! and I hope you will continue to follow the adventures from me and my friends also in 2005.

On the way to C1(31.12.2004)
30.12
We (Simone and Piotr) started today early. In our rucksacks we had ropes, climbing equipment, tent, sleeping bags, food and all what is necessary for setting a camp. The wind came and the weather is changing. After a few hours we reached the point which Darek and Jacek left depot in. We took also those things and heavy loaded we came under the big serac, below huge crevasse where we found a good place for our Camp I. The altitude is about 6550.

Tomorrow we'd like to work higher. Now the weather is quite good, a lot of clouds, sometimes sun and the wind is shaking our tent, but not blowing us out from the wall.

Ciao, Simone

(27.12.2004)

24.12
Finally we reached base camp of the south face of Shisha pangma. We trek 2 days together with our carovan of 32 yaks and yesterday afternoon we arrived here at 5250 meters. Today we worked to fix all the tends of base camp and fix them with ropes and big stones to avoid that wind brake them during next storms. Tonight we will celebrate our Christmas and Jan prepared a nice Christmas tree in the dining tend. Tomorrow we probably go to ABC and back to BC, to carry some equipment. We wish all of you our greetings and Marry Christmas!!!

 
base camp

Simone, Jan, Darek, Piotr, Jacek

(22.12.2004)

22.12
Today we finaly start from Nyalam. Yesterday we hardly discuss with the yak drivers and Laison officier about the weight that each yak can carry and price of the extra yak we have to take. The yak drivers said that each yak can carry 40 kg. but the truth is that 60 kg is the normal weight agreed since ever with them and TMA. In this way we discussed for some hours and at the end we agreed that we will take and pay 10 extra yaks and other 5 extra will be paid from TMA. Totally we started this morning wiht 32 yaks to transport our 1606 kg of equipment, gas, kerosene, food and all necessary to remain for 2 month at B.C and on high camps. The weather is still good even the temperature went down in compare of one week before.
Ciao Simone and all team

21.12
I left my computer and modem behind in the bin. Instead, I'm writing with Piotr's PC because he's come up on the roof of the hostel where we're staying in order to send messages. We're sentries up here…

We arrived in Nyalam today. We left yesterday because today there was supposed to be a strike with numerous blockades on the street from Kathmandu to the border. Unfortunately, although we left yesterday we still had problems half an hour before Kodhari (on the border of Nepal and China). A military street blockade with a barbed wire and machine gunners lined up forced us to wait until the next day to continue. We were able to sleep in a small private house and eat in a hut for the Nepalese.
The block was due to an armed clash with Maoists a few hours prior to our arrival, which had killed 11 people! This morning we left and passed the "Friendship Bridge," crossing into Tibet. We met Dawa, the liason officer and Nawang, who was the liason officer for JC Lafaille. He told us that the French alpinist had arrived in Tibet on the 11th of November.

A few days ago, before returning to Nepal, he gave Lafaille the certificate which proves his climb to the peak at 14:00 on December 11th, but he did not write "WINTER EXPEDITION" even though the Frenchman insisted he write it because he didn't consider it a winter climb. Nawang says that he has 10 years of expedition experience in all 4 seasons and Lafaille's climb was not to be registered with the TMA as a "WINTER EXPEDITION" but as "LATE AUTUMN." Anyone can contact Nawang at the TMA in order to confirm this.

The French alpinist got his Chinese Visa extended because he only intended to stay 30 days and as he entered Tibet and started the expedition before December 1st, he acted with the normal autumn permission. With all this news and clarification, added to the scientific one of the world season calendar which says that winter starts the 21st of December, we must consider that Shisha Pangma has never been conquered in winter. Now it's up to us to see if this climb is possible…
Bye, Simone

Translation by Jonathan Etes

(15.12.2004)
Our trekking to go back to Kathmandu began today. Now we are in Deboche at 3700 meters and tomorrow some of us will go to Lukla and 1 or 2 members will spend other 2 days going down. Tomorrow we will meet Jan Szulc that should be in Namche as he arrived 1 week later than us in Nepal.

Today we navigated in internet to see how is going with the news about the JC Lafaille climb on Shisha. With huge surprise we saw the photo of the "new line" of JC, because we discovered that 50% of that route is our route of last winter (green line)!!!!! We have photos and film of that line we made last December and January (till the point where the route cross the number 5 and 6). We didn't considered that part as new because the aim of the Spanish route we climbed was to follow the big coloir from the base of the wall to the summit, and our line had been only the physiological variant in order to the ice and weather conditions. In any case we sent many photos already one years ago to my web site and the most important world web site and our line and story should be well known.

In any case we would like to congratulate JC Lafaille for the good climb and the success. Really! We also would like to congratulate him for the tactics.....
We really don't want to make any discussion and polemics. The world is already full of wars and problems and we believe that should be stupid to increase the "bordel" with extra stupid discussion.

Simone, Darek, Piotr

(16.11.2004)
Everything is working well here in preparing the expedition. Monday will flight to Kathmandu our cargo with equipment and food we will use during the 2month expedition. I and my friends planned to go in Khumbu valley for a trekking to Everest base camp and easy climbs for acclimatisation in the areas.

After that we will start by road to Kodhari- Zangmu and Nyalam and from that village we will trek till the Shisha Pangma south face base camp.

Only at base camp we will decide the route we will attempt. We want to see directly the snow condition of the face and the weather forecast we will have from Innsbruck from my personal friend Karl Gabl.

Herewith I'm sending you the postcard I prepared for our expedition. I dind't received yet the cable but I took free all next week to realize all the procedure and training with iPAQ and Contact 3.0. Keep in touch

SHISHA PANGMA WINTER 2004-2005
(27.10.2004)
"Winter is back and I am off once again to face the ascent this season of an 8000 metre peak. Last January, at the beginning of 2004, only 300 vertical metres stopped us from achieving the first historical winter ascent of Shisha Pangma’s 8027 metres in the Himalayas..."

Author: Simone Moro

© 1999-2007 Mountain.RU
Mail to: info@mountain.ru
Ðåéòèíã@Mail.ru Rambler's Top100